The Options tab allows to manage the stations on which the current proposal line would be scheduled:
Extend line to other stations
Ad Insertion - Select the network(s) for transmitting the commercial events. The target networks can be:
Main network (0) - If selected (default), the commercial (e.g. a national advertisement) would be scheduled and transmitted across all networks.
The main network is the one that holds the programming common to all networks (e.g. regions).
Regional networks (1, 2, 3...) - If selected, the commercial (e.g. a local advertisement) would be scheduled for transmitting across the selected network. Only one network can be selected.
The regional networks are used for Ad Insertion (See Etere Ad Insertion), that is, for transmitting specific advertisements on a targeted networks.
NB: In case the "check product code" rule is enabled, the system will check for category conflicts between commercials scheduled in the main network and those scheduled in ad insertion network.
Scheduled station - Set the station on which the proposal line is intended to be scheduled. By default, the current station is selected.
The availability of the line (and its order) across stations would depend on whether the "enable orders visibility for all stations" parameter is enabled or disabled (in Etere Configuration) :
Disabled - Order/proposal lines will be available -besides from their input station- also from the stations assigned to their lines.
Enabled - Order/proposal lines will be available -besides from their input station- also from any other station.
NB: Modifying orders lines from their input station (e.g. channel 01) is allowed to all users; instead, the "Sales Proposal\Lines_edit\Others_than_owner" right is required to allow users to modify from a different station (e.g. channel 03) all those lines assigned to said station (e.g. channel 03).
Create a new line for each selected station - Use it to extend the current line to other stations, a new line would be created within the current proposal for all selected stations featuring the same general data and linked assets.
Rules
Check product code - By enabling this parameter, proposal lines won't be scheduled in those segments which already contains a commercial with the same product category,
Ignore insertion rules but log the event - If activated, the scheduling process would ignore rules but would log them into the scheduling report,
Ignore insertion - Use this parameter ONLY if intended to completely ignore rules.
Type - Select the segment type(s) to which the proposal line is related to. Make sure that selected segment type(s) are allowed to contain the assets (e.g.: commercials) that would be assigned to the proposal line, otherwise, it is not possible to schedule them on associated segments.