Automation Schedule

59.5.8.8 List of Days in Progress

Report Description

The List of Days in Progress report allows for generating a report containing all the tasks performed by the operators on a specific station and within a certain date range.

Report Filters

All the parameters that permit a detailed report generation have been spread across seven different tabs to allow a more manageable configuration. By default, all filters are disabled (i.e., either blank or unselected); to enable them, it is enough to configure at least one parameter inside. Available filters include:
From - to: Use it to filter the users by their task date.
Stations: Specify the stations on which operations must have been performed to be included in the report,

Report Preview

The [Settings] permits configuring the page layout of the outgoing document; once filters and settings have been set, it will be possible to select between displaying a preview using the related [Preview] button or printing the document directly using the [Report] button. Please note that some reports permit the export of the generated document in the most common formats (pdf, CSV, doc, xls, XML, etc) just by using the [Export] button.

List_of_Days_in_Progress


List_of_Days_in_Progress