Common Features

202.2.4.9 Extended Scheduling Report

The extended scheduling report is a detailed log containing all the successful and unsuccessful scheduling actions performed during a scheduling operations:
Each scheduling attempt is included in the report, indicating either the success (i.e. reserved!) or the failure of the event placement. Among the common reasons are:

•The asset is not suitable due to its parental guidance: The type of the asset linked to the event has a conflict with the 'parental guidance' allowed for the target segment.

•Target time in the day is less than current time plus the scheduling offset: The event has been attempted to be scheduled in the current day but its scheduling time is outside the offset limit (i.e. it's too close to the current time).

•BL management: indicates that an event has been black listed owing to a failed scheduling.