The Integration List tab allows to create of a list of fillers composed of the following material types:
Material type - Integration filler
Description: Repository assets of a particular type (e.g. spots, trailers, etc.)
Selection: Manual
Note: Integration Lists are used to fill segments using only one filler by segment (the one with the maximum possible duration concerning the segment space)
Available functions
The Integration List can be managed through the following functions:
Refresh - Reload all information displayed in the list.
Add - Fillers can be manually added using the following buttons:
Add Integration Fillers - Manually select a particular asset type to automatically insert all valid assets for the chosen day, match the specified style (s), last more than one frame, and are allowed for the current station.
Remove - Remove the selected filler from the list.
Custom filters can also be removed by right-clicking on them and choosing "Remove".
Dates - Shows the current open date, the day to which fillers will be applied.
Force Priority - Give fillers a fixed priority (between 4 and 996). This option is useful, for example, to make fillers fall in after paid events scheduled with a lower priority (e.g. 600).
NB: By default, integration fillers are inserted with a '998' priority (i.e. at the end of segments, after "bottom" events).